Skip to content
Roman Contractors

Roman Contractors

romancon

  • Home
  • Completed Projects
    • Boardwalks and Bridges
      • Emu Park ANZAC Memorial Boardwalk
      • Inala Bikeway Pedestrian Bridge Install
      • Diggers Drive Bridge Re-Decking
      • Hay Street Footbridge Replacement
      • Rocky Creek Dam Footbridge Replacement
      • Bicentennial Boardwalk Replacement Stage 2
      • Collins Street Boardwalk
      • Bucasia Shared Pathway Bridges
      • Kosciuszko Mt Lee Walkway
      • Remove and Replace 4 Bridges Redlands
      • Tin Can Bay Foreshore 3 Bridges Install
      • Fisherman’s Lookout and Wategos Beach track upgrade
      • Bardon Footbridge Install
      • Mooloolaba Footbridge Replacement
      • Harbour Road Shared Path Boardwalk Install
      • Ron Searle Drive Boardwalk Install
    • Flood Remediation
      • Paterson River Flood Remediation
      • Tweed Landslip Repairs
    • Water and Wastewater
      • City Botanic Gardens Water Reticulation Upgrade
      • Toowong Bus Depot Relocation of Water Mains
      • Banora Point Rising Main Replacement
      • Lakes Creek SPS Civil Safety Upgrade
  • Contact
  • About Us

Boardwalks and Bridges

Emu Park ANZAC Memorial Boardwalk

Inala Bikeway Pedestrian Bridge Install

Diggers Drive Bridge Re-Decking

Remove and Replace Hay Street Footbridge

Rocky Creek Dam Footbridge Replacement

Bicentennial Boardwalk Replacement – Stage 2

Collins Street Footbridge Install

Bucasia Shared Pathway Bridges Install

Kosciuszko Mt Lee Walkway

Remove and Replace 4 Bridges Redlands

Tin Can Bay Foreshore 3 Bridges Install

Fisherman’s Lookout and Wategos Beach track upgrade

Bardon Footbridge Install

Remove and Replace Mooloolaba Footbridge

Harbour Road Shared Path Boardwalk Install

Ron Searle Drive BW2_2

Ron Searle Drive Shared Path Boardwalk Install